Airside Projects was engaged as the lead consultant to develop a cool room facility at Brisbane Airport. The new cold chain facility is capable of servicing perishable needs with an internal cool room, two fumigation chambers, and an external cool room. The project was successfully delivered in seven months through effective management to ensure minimal disruption to live operations in a high-security environment.
The key challenges include working in security restricted environments, coordinating construction activities within an operating ground handling facility and modifying the existing structure to withstand the dead loads of cool room panels and equipment.
Type: Construct Only
Location: Brisbane Airport